INTERNATIONAL
1. SS Kijevska 750/330kV
Investor: UKROENERGO
Project description: Design (detailed and as-built design), construction and electrical installation works, delivery and installation of primary and secondary equipment (circuit breakers, disconnectors, voltage and current transformers, surge arresters, relay protection and automation systems, AC/DC auxiliary power supply, communication equipment), functional testing and commissioning. 3 phases (1 set) of single-phase transformers 750/330/15.75 kV, Rated power: 3x333 MVA - 3 phases (1 set) of transformers with cross regulation 110 kV, Rated power: 3x92 MVA, 1X750 kV Transformer fields, 1X330 kV Transformer fields, 2X330 kV Conduction fields, Expansion of 330 kV busbars, double system, 5 fields
2. SS Vinnytska 750kV
Investor: UKROENERGO
Project description: Delivery and installation of 750kV disconnectors, delivery of voltage instrument transformers, surge arresters, supporting insulators, HF chokes and capacitors.
3. SS Mostar 7
Investor: Elektroprijenos BiH
Project description: (main and as-built design), obtaining permits (construction and use), delivery and installation of primary and secondary equipment, construction works. Functional testing and commissioning: 2 new energy transformers with rated power 40/40/27 MVA, produced by KONČAR-Distribution and Special Transformers·• d.d. Zagreb. transmission ratio 110/10.5(21)/10.5 kV with the scope of voltage regulation under load on the primary I IO±I0xl.5% kV or from 93.5 kV to 126.5 kV with 126.5 kV as the highest voltage of the primary winding.
12 pcs of high-voltage 110 kV conductive insulators, 18 pcs of self-supporting 20kV medium voltage switchgear, control and protection 110 kV, control and protection 20 and 10 kV, procurement of equipment, upgrading and testing of the remote-control system.
4. SS Mostar 4
Investor: Elektroprijenos BiH
Project description: Procurement of a power transformer 220/110/10.5 kV, 150 MVA, YNa0 d5. The scope of delivery included the following: design, manufacture, factory testing, transportation to the installation site, unloading at the installation site, supervision of installation, testing and supervision of commissioning of the power transformer: 150 MV A type A RZ150000-245 with the associated control switch and voltage regulator.